Screw Conveyor Capacity: What the Fill Factor Really Means
Every screw conveyor quotation carries a tonnage figure, and almost none of them are comparable to each other. The reason is that a screw does not move a full trough of material — it moves a fraction of it, and that fraction is decided by your material, not by the machine. Two conveyors of the same diameter, quoted at the same output, can differ by a factor of two in what they actually carry, because one supplier assumed a fill the other did not.
This article explains where the capacity figure comes from, which material properties change it, and which parts of the machine fail first.
I. What a Screw Conveyor Is Good At
A screw conveyor is a volumetric device: a helical flight rotates inside a trough or tube, and material is pushed along by the face of the flight, sliding on the trough bottom. It is compact, enclosed, easy to seal, and it can be fed and discharged at several points along its length. Those are real advantages in a plant where space is tight and dust must be contained.
• Short distances. It is designed for compact runs between machines, not for moving material across a site.
• Contained material. Dust, odour and spillage are easy to control because the trough is closed.
• Multiple points. Several inlets or outlets along one casing are straightforward; on a belt they are not.
• Metering. With a controlled inlet, a screw is a usable volumetric feeder, which is why it so often sits under a bin.
• What it is not: a cheap belt conveyor. It costs more energy per tonne, it works the material harder, and it is far less forgiving of a bad layout.
II. Where the Capacity Figure Comes From
A screw's output is the volume swept by one turn of the flight, multiplied by the number of turns and by how much of that volume is actually filled. The first two parts are geometry and speed — fixed by the machine. The third is a property of the material, and it is where quotations diverge.
• Fill is never total. Material slides rather than being carried, so the working fill is a fraction of the trough cross-section — and that fraction falls as the material becomes more free-flowing, more aerated or more prone to rotating with the flight.
• Bulk density converts volume to tonnes. A light, aerated powder and a damp, dense one occupy the same trough and weigh very differently. Quotations in cubic metres and quotations in tonnes are not the same statement.
• Speed is limited by the material, not the bearing. Abrasive material is run slowly to protect the flight; free-flowing material is run slowly to stop it being thrown and aerated. A higher speed does not simply multiply output.
• So the honest question is not "what is its capacity" but "at what fill, at what speed, for which material" — and a supplier who cannot answer in those terms has quoted a number, not a machine.
III. Four Material Properties That Decide the Design
| Property | What it does | Design response |
| Abrasive | Wears the outer flight edge and the trough floor | Thicker or hard-faced flights, lower speed, replaceable trough liner |
| Cohesive or sticky | Builds up on the flight and between hanger bearings | Shaftless flight, larger pitch, fewer intermediate supports, cleanout access |
| Friable | The flight crushes and polishes the product as it pushes | Lower fill, lower speed, or a different conveyor type entirely |
| Hot or hygroscopic | Expansion, condensation, caking in the casing | Expansion allowance at the drive end, insulation, sealed bearings |
One of these four usually decides the machine. A buyer who describes the material as "powder" gets a generic quotation; a buyer who says "abrasive, slightly damp, and it must not be broken" gets a different pitch, a different flight thickness and a different speed.
IV. The Parts That Fail First
• The outer edge of the flight. This is where the sliding happens, so it wears fastest — and once the diameter is reduced, capacity falls with it. A trough liner protects the casing; the flight itself needs thickness to spare.
• Hanger bearings. Every intermediate support is a bearing in the material stream: it obstructs flow, it collects build-up, and it is inaccessible when it fails. Their number is a design choice with a maintenance consequence.
• The shaft on long spans. Deflection under a full trough is what turns a conveyor into a vibration problem, and vibration is what cracks flights at the weld.
• The discharge end. If the outlet cannot pass what the screw delivers, material compacts at the last flight and the machine jams rather than spills — a jam that usually requires opening the casing.
• The drive under a full start. A loaded screw needs far more torque to start than to run, which is why the machine must be started empty and stopped after it has cleared.
V. Layout Rules That Prevent Most Problems
• Feed at the flight, not onto the shaft. An inlet that drops material onto the centre pipe causes build-up and uneven loading; the inlet should present material to the leading face.
• Keep the incline modest. A screw loses capacity quickly as it is tilted, and beyond a certain angle the material simply rotates with the flight. Steep lifts belong to other equipment.
• Give the discharge room to breathe. The outlet, the chute below it and the machine it feeds must pass the peak rate, not the average.
• Plan for cleanout. Any material that can cake will cake, and a screw with no inspection hatch is a screw that gets cut open.
• Interlock feed and drive. Stop the feed first, let the screw clear, then stop the screw. The reverse order fills the trough and guarantees a hard start next time.
VI. Sizing the Drive Is Not a Detail
Screw conveyors are quoted on running power, but they are bought on starting behaviour. Material in a full trough resists movement until it shears, and that first moment demands torque the running figure does not describe. A drive with no margin trips on the first cold morning; a drive with a variable frequency unit can be brought up gently and matched to the material's behaviour. Ask what starting torque the quotation assumes, and whether the motor is sized for a full or an empty start.
VII. What to Ask the Supplier For
• The fill factor assumed, and the material classification behind it — this is the number that makes two quotations comparable.
• Output stated in tonnes per hour at a given bulk density, not only in cubic metres.
• Flight thickness, material and whether the edge is hard-faced, plus whether a trough liner is included.
• The number and type of hanger bearings, and how each one is accessed for replacement.
• Maximum recommended length and incline for the quoted diameter, before capacity falls away.
• Starting torque and the starting method — direct-on-line, soft start or variable frequency — with the reason for the choice.
Frequently Asked Questions About Screw Conveyors
Q: How do I compare two screw conveyor quotations with different capacities?
A: Ask each supplier for the fill factor and the bulk density used. Once both figures are on the table, the outputs either line up or one quotation was written for a material you do not have.
Q: Why does my screw conveyor keep blocking at the discharge?
A: Because the outlet or the chute below it passes less than the screw delivers. The screw is a positive feeder — it does not slow down when the outlet is restricted, it compacts the material instead.
Q: Can a screw conveyor run on an incline?
A: It can, but capacity falls as the angle rises and beyond a modest incline the material starts rotating with the flight instead of advancing. If the lift is significant, another conveyor type is usually the better answer.
Q: When should the flight be shaftless?
A: For sticky, fibrous or lumpy material that would wrap or build up on a centre pipe and bridge between hanger bearings. Shaftless designs remove both of those obstructions at the cost of length limits.
Q: Does a screw conveyor damage the product?
A: It works material harder than a belt does — sliding against the trough and rubbing between flights. For friable or shape-sensitive products, that is a real cost and often the reason another conveyor is chosen.